Rifle Tube Remodel – Day 2

We had more debris and dirt than MT2 calculated in their bid.  They brought two roll-offs and have filled them.  I authorized them to get a third.

Unfortunately, the bottom of the box is dirt.

They will have all the dirt out this afternoon.

20160412_091748

20160412_141803

20160412_090850